METHOD OF FREEZING GROUND

To achieve good adhesion between frozen soil and a shield tunnel.SOLUTION: A method of freezing the ground includes, when constructing a shield tunnel 10 with a shield machine 1, filling between tail brushes 21 of the shield machine 1 with a filling material (e.g., tail grease 22) and filling tail v...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: FUKUDA KATSUHITO, FUKUDA MASAHIRO, MASUTANI MAI, SATO KAZUNARI
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To achieve good adhesion between frozen soil and a shield tunnel.SOLUTION: A method of freezing the ground includes, when constructing a shield tunnel 10 with a shield machine 1, filling between tail brushes 21 of the shield machine 1 with a filling material (e.g., tail grease 22) and filling tail void 31 behind the tail brush 21 with backfill material 35 (step S1), cleaning at least the area between an outer peripheral surface 33 of the shield tunnel 10 and the backfill material 35 in the tail void 31 (step S2), and, after this cleaning, freezing the ground around the shield tunnel 10 together with the backfill material 35 in the tail void 31 (step S3).SELECTED DRAWING: Figure 3 【課題】凍土とシールドトンネルとの良好な凍着を実現する。【解決手段】地盤の凍結方法は、シールド機1でシールドトンネル10を構築する際に、シールド機1のテールブラシ21間に充填材(例えばテールグリース22)を充填し、テールブラシ21の後方のテールボイド31内に裏込め材35を充填すること(ステップS1)、少なくとも、シールドトンネル10の外周面33とテールボイド31内の裏込め材35との間を、洗浄すること(ステップS2)、及び、この洗浄が行われた後に、シールドトンネル10の周辺の地盤を、テールボイド31内の裏込め材35と共に凍結すること(ステップS3)、を含む。【選択図】図3