WORK MANAGEMENT METHOD, WORK MANAGEMENT SYSTEM AND WORK MANAGEMENT PROGRAM

To improve the precision of an evaluation value for evaluating work in a farm field.SOLUTION: A work management method includes determining most recent tracks 620 showing tracks of one or more work devices 30 in a most recent period based upon operation information on the one or more work devices 30...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: MITANI HIDEKI, SAWAMURA AKIRA
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To improve the precision of an evaluation value for evaluating work in a farm field.SOLUTION: A work management method includes determining most recent tracks 620 showing tracks of one or more work devices 30 in a most recent period based upon operation information on the one or more work devices 30 in the most recent period showing a predetermined most recent period. The work management method also includes outputting image information showing the most recent tracks 620 of the one or more work devices 30 and a progress image 600 representing work quantity information representing the quantity of work performed by the one or more work devices 30 in the most recent period. The work quantity information may include area information showing an area where the one or more work devices 30 work before the most recent period.SELECTED DRAWING: Figure 7 【課題】圃場における作業を評価する評価値の精度を向上する。【解決手段】作業管理方法は、直近の所定の期間を表す直近期間における1台以上の作業装置30の稼働情報に基づき、直近期間における1台以上の作業装置30の軌跡を表す直近軌跡620を決定することを含む。また、作業管理方法は、1台以上の作業装置30の直近軌跡620と、直近期間より前に1台以上の作業装置30により行われた作業の作業量を表す作業量情報とを表した進捗画像600を示す画像情報を出力することを含む。作業量情報は、直近期間より前に、1台以上の作業装置30が作業を行った領域を表す領域情報を含んでもよい。【選択図】図7