INVERT BLOCK INSTALLATION METHOD
To easily perform construction for preventing ground swelling in a tunnel in a short construction period at low cost.SOLUTION: A cross pile B is installed between adjacent lane division piles 12 erected in a tunnel, on the side opposite an invert block installation side from a center of the piles 12...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To easily perform construction for preventing ground swelling in a tunnel in a short construction period at low cost.SOLUTION: A cross pile B is installed between adjacent lane division piles 12 erected in a tunnel, on the side opposite an invert block installation side from a center of the piles 12 in the tunnel axial direction, and the ground on an invert block installation side is excavated. The invert block 10 is composed of multiple steel elements 10e connected in parallel to each other toward the tunnel axial direction, has a hollow structure with an upper plate 10ts, a lower plate 10us and an outer periphery plate 10sf, and has recesses 10er formed in at least some of the elements 10e to avoid interference with the piles 12, and is installed so that the recesses 10er fit into the piles 12.SELECTED DRAWING: Figure 8
【課題】トンネルにおける盤膨れ防止の施工を、短い工期で、低コスト且つ容易に行うこと。【解決手段】トンネル内に立設された車線区画用の隣り合う杭12の間に架け渡すようにして、当該杭12のトンネル軸方向の中央部よりもインバート用ブロック設置側と反対側に横矢板Bを設置し、インバート用ブロック設置側の地盤を掘削し、トンネルの軸方向に向かって相互に並列接続された複数の鋼製のエレメント10eで構成されて、上板10ts、下板10usおよび外周板10sfを備えた中空構造とされ、杭12との干渉を回避する凹部10erが少なくとも一部のエレメント10eに形成されたインバート用ブロック10を、凹部10erが杭12に嵌まり込むようにして設置する。【選択図】図8 |
---|