WORK MANAGEMENT METHOD OF CONSTRUCTION MACHINE
To improve construction efficiency when multiple construction machines including automatically driving construction machines work within a specified work area.SOLUTION: A work management method of a construction machine 2 includes: an automatic work content transmission step in which an automatic wo...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To improve construction efficiency when multiple construction machines including automatically driving construction machines work within a specified work area.SOLUTION: A work management method of a construction machine 2 includes: an automatic work content transmission step in which an automatic work content which is a work to be automatically operated is transmitted from a work management system 100 to an automatically driven construction machine 2; and an area setting step in which an automatic work area A where a work by the automatically driven construction machine 2 is performed is set and an area that includes the automatic work area A and is larger than the automatic work area A is set as a no-entry area NA where other construction machines 2 and workers are prohibited from entering. The automatic work area A is set as position information in the automatic work content, and the automatically driven construction machine 2 performs work based on the position information.SELECTED DRAWING: Figure 5
【課題】自動運転可能な建設機械を含む複数の建設機械が所定の作業領域内で作業を行う場合の施工効率を向上させる。【解決手段】建設機械2の作業管理方法は、作業管理システム100から自動運転する建設機械2に対して自動運転により行われる作業である自動作業内容を送信する自動作業内容送信工程と、自動運転する建設機械2による作業が行われる自動作業エリアAを設定するとともに、自動作業エリアAを含み自動作業エリアAよりも広いエリアを他の建設機械2や作業員の進入が禁止される進入禁止エリアNAとして設定するエリア設定工程と、を有し、自動作業エリアAは、自動作業内容において位置情報として設定され、自動運転する建設機械2は、位置情報に基づいて作業を行う。【選択図】図5 |
---|