INFORMATION PROCESSOR AND INFORMATION PROCESSING PROGRAM

To prevent a situation where a manufacturing process can no longer be assigned to an operation schedule of a machine.SOLUTION: A processor is included which can associate a manufacturing process for manufacturing products with a machine group including a plurality of machines capable of executing th...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: SAWADA HISAHIRO
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator SAWADA HISAHIRO
description To prevent a situation where a manufacturing process can no longer be assigned to an operation schedule of a machine.SOLUTION: A processor is included which can associate a manufacturing process for manufacturing products with a machine group including a plurality of machines capable of executing the manufacturing process, and in a case where the manufacturing process and the machine group are associated with each other, the manufacturing process is assigned to the operation schedule of any of the plurality of machine groups based on predefined conditions.SELECTED DRAWING: Figure 9 【課題】機材の稼働スケジュールへの製造工程の割り当てができなくなる事態を抑制する。【解決手段】プロセッサを備え、前記プロセッサは、製品を製造する製造工程と、当該製造工程を実行可能な複数の機材を含む機材群と、の関連付けが可能であり、前記製造工程と前記機材群とを関連付けた場合において、当該製造工程を、予め定められた条件に基づき、前記複数の機材のいずれかの稼働スケジュールに割り当てる。【選択図】図9
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2024070719A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2024070719A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2024070719A3</originalsourceid><addsrcrecordid>eNrjZLDw9HPzD_J1DPH091MICPJ3dg0O9g9ScPRzUcAi4-nnDmK6Bzn68jCwpiXmFKfyQmluBiU31xBnD93Ugvz41OKCxOTUvNSSeK8AIwMjEwNzA3NDS0djohQBAO7MKWc</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>INFORMATION PROCESSOR AND INFORMATION PROCESSING PROGRAM</title><source>esp@cenet</source><creator>SAWADA HISAHIRO</creator><creatorcontrib>SAWADA HISAHIRO</creatorcontrib><description>To prevent a situation where a manufacturing process can no longer be assigned to an operation schedule of a machine.SOLUTION: A processor is included which can associate a manufacturing process for manufacturing products with a machine group including a plurality of machines capable of executing the manufacturing process, and in a case where the manufacturing process and the machine group are associated with each other, the manufacturing process is assigned to the operation schedule of any of the plurality of machine groups based on predefined conditions.SELECTED DRAWING: Figure 9 【課題】機材の稼働スケジュールへの製造工程の割り当てができなくなる事態を抑制する。【解決手段】プロセッサを備え、前記プロセッサは、製品を製造する製造工程と、当該製造工程を実行可能な複数の機材を含む機材群と、の関連付けが可能であり、前記製造工程と前記機材群とを関連付けた場合において、当該製造工程を、予め定められた条件に基づき、前記複数の機材のいずれかの稼働スケジュールに割り当てる。【選択図】図9</description><language>eng ; jpn</language><subject>CALCULATING ; COMPUTING ; CONTROL OR REGULATING SYSTEMS IN GENERAL ; CONTROLLING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS ; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS ; PHYSICS ; REGULATING ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240523&amp;DB=EPODOC&amp;CC=JP&amp;NR=2024070719A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76418</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240523&amp;DB=EPODOC&amp;CC=JP&amp;NR=2024070719A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SAWADA HISAHIRO</creatorcontrib><title>INFORMATION PROCESSOR AND INFORMATION PROCESSING PROGRAM</title><description>To prevent a situation where a manufacturing process can no longer be assigned to an operation schedule of a machine.SOLUTION: A processor is included which can associate a manufacturing process for manufacturing products with a machine group including a plurality of machines capable of executing the manufacturing process, and in a case where the manufacturing process and the machine group are associated with each other, the manufacturing process is assigned to the operation schedule of any of the plurality of machine groups based on predefined conditions.SELECTED DRAWING: Figure 9 【課題】機材の稼働スケジュールへの製造工程の割り当てができなくなる事態を抑制する。【解決手段】プロセッサを備え、前記プロセッサは、製品を製造する製造工程と、当該製造工程を実行可能な複数の機材を含む機材群と、の関連付けが可能であり、前記製造工程と前記機材群とを関連付けた場合において、当該製造工程を、予め定められた条件に基づき、前記複数の機材のいずれかの稼働スケジュールに割り当てる。【選択図】図9</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>CONTROL OR REGULATING SYSTEMS IN GENERAL</subject><subject>CONTROLLING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</subject><subject>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</subject><subject>PHYSICS</subject><subject>REGULATING</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLDw9HPzD_J1DPH091MICPJ3dg0O9g9ScPRzUcAi4-nnDmK6Bzn68jCwpiXmFKfyQmluBiU31xBnD93Ugvz41OKCxOTUvNSSeK8AIwMjEwNzA3NDS0djohQBAO7MKWc</recordid><startdate>20240523</startdate><enddate>20240523</enddate><creator>SAWADA HISAHIRO</creator><scope>EVB</scope></search><sort><creationdate>20240523</creationdate><title>INFORMATION PROCESSOR AND INFORMATION PROCESSING PROGRAM</title><author>SAWADA HISAHIRO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2024070719A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; jpn</language><creationdate>2024</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>CONTROL OR REGULATING SYSTEMS IN GENERAL</topic><topic>CONTROLLING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</topic><topic>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</topic><topic>PHYSICS</topic><topic>REGULATING</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>SAWADA HISAHIRO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SAWADA HISAHIRO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>INFORMATION PROCESSOR AND INFORMATION PROCESSING PROGRAM</title><date>2024-05-23</date><risdate>2024</risdate><abstract>To prevent a situation where a manufacturing process can no longer be assigned to an operation schedule of a machine.SOLUTION: A processor is included which can associate a manufacturing process for manufacturing products with a machine group including a plurality of machines capable of executing the manufacturing process, and in a case where the manufacturing process and the machine group are associated with each other, the manufacturing process is assigned to the operation schedule of any of the plurality of machine groups based on predefined conditions.SELECTED DRAWING: Figure 9 【課題】機材の稼働スケジュールへの製造工程の割り当てができなくなる事態を抑制する。【解決手段】プロセッサを備え、前記プロセッサは、製品を製造する製造工程と、当該製造工程を実行可能な複数の機材を含む機材群と、の関連付けが可能であり、前記製造工程と前記機材群とを関連付けた場合において、当該製造工程を、予め定められた条件に基づき、前記複数の機材のいずれかの稼働スケジュールに割り当てる。【選択図】図9</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng ; jpn
recordid cdi_epo_espacenet_JP2024070719A
source esp@cenet
subjects CALCULATING
COMPUTING
CONTROL OR REGULATING SYSTEMS IN GENERAL
CONTROLLING
COUNTING
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES
FUNCTIONAL ELEMENTS OF SUCH SYSTEMS
MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS
PHYSICS
REGULATING
SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR
title INFORMATION PROCESSOR AND INFORMATION PROCESSING PROGRAM
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-08T11%3A21%3A56IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SAWADA%20HISAHIRO&rft.date=2024-05-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2024070719A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true