FLOATING BODY CONSTRUCTION METHOD OF OFFSHORE WIND POWER GENERATION FACILITY WITH SPAR-TYPE FLOATING BODY

To provide a floating body construction method of an offshore wind power generation facility with a spar-type floating body capable of preventing the crack initiation and damage of a concrete ring without the reinforcement of the concrete ring.SOLUTION: A floating body construction method of an offs...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: OKITA YOSHITAKA, KUMAI TAKASHI, ASANO HITOSHI, NISHIYAMA KEIJI, KIMURA MORITAKA, SONOBE NAOTO, SAGISHIMA HIDEYUKI
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To provide a floating body construction method of an offshore wind power generation facility with a spar-type floating body capable of preventing the crack initiation and damage of a concrete ring without the reinforcement of the concrete ring.SOLUTION: A floating body construction method of an offshore wind power generation facility with a spar-type floating body consists of: a first step of installing two jack-up type working platforms 30, 30 with a floating body gripper mechanism 34 and a crane 33; a second step of floating a concrete ring unit 11 assembled with multi-stage concrete rings 15 from the lowest stage side on the sea and holding the concrete ring unit by the floating body gripper mechanism 34; a third step of completing a concrete floating body part 4A by a procedure in which the concrete rings 15 are stacked in order on the upper side of the concrete ring unit 11 by using the crane 33 and the concrete rings are fastened with a PC steel material 19 so as to be integrated; and a fourth step of connecting a steel floating body 4B to the upper part side of the concrete floating body part 4A by using the crane 33 and completing the floating body 4.SELECTED DRAWING: Figure 6 【課題】スパー型浮体を備えた洋上風力発電設備の浮体建造方法であって、コンクリートリングの補強を行うことなく、コンクリートリングのクラック発生や破損を防止する。【解決手段】浮体グリッパー機構34及びクレーン33を備えた2基のジャッキアップ型作業構台30、30を設置する第1ステップと、最下段側から複数段のコンクリートリング15を組み立てたコンクリートリングユニット11を海上に浮かべ、浮体グリッパー機構34によって保持させる第2ステップと、コンクリートリングユニット11の上側に、クレーン33を用いて、順にコンクリートリング15を積み上げるとともに、PC鋼材19で緊結して一体化を図る手順によりコンクリート製浮体部4Aを完成させる第3ステップと、クレーン33を用いて、鋼製浮体部4Bをコンクリート製浮体部4Aの上部側に連結して浮体4を完成させる第4ステップとからなる。【選択図】図6