OPERATION PLAN MODIFICATION SUPPORT DEVICE, OPERATION PLAN MODIFICATION SUPPORT METHOD, AND OPERATION MANAGEMENT SYSTEM

To provide an operation plan modification support device, an operation plan modification support method, and an operation management system that can reflect an intention of an operator in charge of operation management and support a work of creating an executable operation plan modification proposal...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YOSHIDA KOKI, YAMASHITA YUKO, TOTSUGI KEISUKE, KOBAYASHI YUICHI, OTA KENJI, KIMURA KEIJI, SOTOYAMA ATSUSHI
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To provide an operation plan modification support device, an operation plan modification support method, and an operation management system that can reflect an intention of an operator in charge of operation management and support a work of creating an executable operation plan modification proposal.SOLUTION: An operation plan modification support device 10 comprises an arithmetic and processing unit 11 and a memory 12, and it generates, for each event, a plurality of first operation suspension policies including a suspension ratio, which is a ratio of the number of suspended trains within a predetermined range to the planned number of trains, as a policy to suspend trains on the basis of a history of the operation plan in events for which the operation plan has been modified in the past by the arithmetic and processing unit 11 executing a program recorded in the memory 12. When an event that interferes with train operation occurs, the operation plan modification support device receives a second suspension policy that is modified on the basis of the first suspension policy corresponding to interference information that is the information about the interference, and creates an operation plan modification proposal that is a proposed modification of the operation plan on the basis of the suspension ratio included in the second suspension policy.SELECTED DRAWING: Figure 2 【課題】運行管理を担当するオペレータの意図を反映するとともに実行可能な運行計画変更案を作成する作業を支援できる運行計画変更支援装置、運行計画変更支援方法および運行管理システムを提供することができる。【解決手段】演算処理装置11と、メモリ12と、を備え、演算処理装置11がメモリ12に記録されたプログラムを実行することにより、過去に運行計画を変更した事象における運行計画の履歴から、列車を運休する方針として、所定の範囲における列車の運休本数と計画本数との割合である運休率を含む第一の運休方針を事象毎に複数生成し、列車の運行に支障が生じる事象が発生した場合は、支障に関する情報である支障情報に対応した第一の運休方針を基に修正された第二の運休方針を受け付け、第二の運休方針に含まれる運休率に基づき、運行計画の変更案である運行計画変更案を作成する運行計画変更支援装置10。【選択図】図2