OPERATING RATE PREDICTION APPARATUS, OPERATING RATE PREDICTION METHOD, AND OPERATING RATE PREDICTION PROGRAM
To provide an apparatus, a method, and a program for predicting operating rates before construction of a wind turbine using wind condition analysis.SOLUTION: According to one embodiment, an operating rate prediction apparatus comprises an input unit for receiving input of first wind turbine informat...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To provide an apparatus, a method, and a program for predicting operating rates before construction of a wind turbine using wind condition analysis.SOLUTION: According to one embodiment, an operating rate prediction apparatus comprises an input unit for receiving input of first wind turbine information that is information about a construction environment of a first wind turbine which is a wind turbine scheduled to be constructed. Further, the apparatus comprises a selection unit for selecting a second wind turbine which is an existing wind turbine that is a model for construction of the first wind turbine, based on the first wind turbine information. Furthermore, the apparatus comprises a calculation unit for calculating an operating rate of the first wind turbine based on second wind turbine information that is information about a construction environment of the second wind turbine. Furthermore, the apparatus comprises an output unit for outputting a calculation result of the operating rate.SELECTED DRAWING: Figure 1
【課題】風況解析を用いた風車建設前における稼働率予測を行う装置、方法およびプログラムを提供する。【解決手段】一つの実施形態によれば、稼働率予測装置は、建設予定の風車である第1風車の建設環境についての情報である第1風車情報の入力を受け付ける入力部を備える。さらに、前記装置は、前記第1風車情報に基づいて、前記第1風車の建設用の模範となる既設風車である第2風車を選定する選定部を備える。さらに、前記装置は、前記第2風車の建設環境についての情報である第2風車情報に基づいて、前記第1風車の稼働率を算出する算出部を備える。さらに、前記装置は、前記稼働率の算出結果を出力する出力部を備える。【選択図】図1 |
---|