INTEGRATED CONSTRUCTION METHOD OF PILE BODY AND STEEL COLUMN AND INTEGRATED STRUCTURE OF PILE BODY AND STEEL COLUMN

To solve the problem in which a foundation construction process is prolonged and cost becomes high.SOLUTION: An integrated construction method of a pile body 1 and a steel column 4 includes steps of: drilling a hole H in the ground G; inserting the pile body 1 into the drilling hole H and burying it...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: KATO MITSUHARU
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To solve the problem in which a foundation construction process is prolonged and cost becomes high.SOLUTION: An integrated construction method of a pile body 1 and a steel column 4 includes steps of: drilling a hole H in the ground G; inserting the pile body 1 into the drilling hole H and burying it in the ground G; constructing an independent foundation 2 installed by a plurality of anchor bolts 3, 3a... with their upper ends protruding, at an upper end of the pile body 1; penetrating the protrusion ends of anchor bolts 3, 3a... into bolt insertion holes 6, 6a... formed at a base plate 5 of the steel column 4, screwing and fastening nuts 7, 7a..., and erecting the steel column 4 on an upper surface of the independent foundation 2. In bar arrangement work in the construction step of the independent foundation 2, by arranging a plurality of hoop reinforcement bars 9, 9a... at an overlapped portion between a plurality of pile head reinforcement bars 8, 8a... provided at the upper end of the pile body 1 and lower end parts of the anchor bolts 3, 3a..., underground beams become unnecessary, the foundation skeleton itself is reduced greatly, the amount of residual soil during the foundation construction is reduced greatly, and also a shorter construction period is achieved. Thus, the total construction cost can be reduced.SELECTED DRAWING: Figure 1 【課題】基礎構築工程が長期化し且つ高額となる。【解決手段】地盤Gに孔Hを掘削する工程と、この掘削孔Hに杭体1を挿設し地盤Gに埋設する工程と、複数本のアンカーボルト3、3a...が上端部を突出させて設置された独立基礎2を前記杭体1の上端に構築する工程と、鉄骨柱4のベースプレート5に形成されたボルト挿通孔6、6a...に前記アンカーボルト3、3a...の突出端を貫通させナット7、7a...を螺嵌締結して、独立基礎2の上面に鉄骨柱4を立設する工程とを有する杭体1と鉄骨柱4との一体化工法であって、独立基礎2の構築工程における配筋作業において、杭体1の上端部に設けられた複数本の杭頭補強筋8、8a...と、アンカーボルト3、3a...の下端部との重合部位に複数本のフープ筋9、9a...を配筋することで、地中梁が不要となって、基礎躯体自体を大幅に削減し、且つ基礎構築時の残土量の大幅に削減し、而も工期短縮を図ることで総工事費の削減を可能とする。【選択図】図1