MANAGEMENT APPARATUS, ELECTRIC POWER SYSTEM, CHARGE/DISCHARGE PLAN CREATION METHOD, AND PROGRAM
To formulate a storage battery charge/discharge plan that meets requirements of a power generation system operator even when a plurality of uses can be considered for storage battery operation.SOLUTION: A management apparatus is connected to a power generation system having a power generation appara...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To formulate a storage battery charge/discharge plan that meets requirements of a power generation system operator even when a plurality of uses can be considered for storage battery operation.SOLUTION: A management apparatus is connected to a power generation system having a power generation apparatus and a storage battery. The management apparatus includes: a storage battery capacity ratio determination unit configured to determine a storage battery capacity ratio, which is a ratio of allocating a capacity of the storage battery to first and second uses, using past actual data and predicted values of a parameter that is highly correlated with the first and second uses of the storage battery among the parameters used when creating a charge/discharge plan for the storage battery; and a plan creation unit configured to create the charging and discharging plan on the basis of the storage battery capacity ratio and requirements of a power generation system operator.SELECTED DRAWING: Figure 1
【課題】蓄電池運用について複数の用途が考えられる場合でも、発電システム運用者の要求事項に沿った蓄電池充放電計画を策定する。【解決手段】実施形態の管理装置は、発電装置および蓄電池を有する発電システムと接続された管理装置であって、前記蓄電池の充放電計画を作成するときに使用するパラメータのうち前記蓄電池についての第1用途、第2用途と相関性の高いパラメータの過去実績データおよび予測値を用いて、前記蓄電池の容量を前記第1用途、第2用途に割り当てる比率である蓄電池容量比を決定する蓄電池容量比決定部と、前記蓄電池容量比および発電システム運用者の要求事項に基づいて、前記充放電計画を作成する計画作成部と、を備える。【選択図】図1 |
---|