CONTROL SYSTEM OF POWER-GENERATING PLANT, POWER-GENERATING PLANT, METHOD OF CONTROLLING POWER-GENERATING PLANT, AND POWER-GENERATING PLANT CONTROL PROGRAM
To provide a control system of a power-generating plant capable of suppressing a response lag of an actual power generation amount with respect to a target power generation amount, a power-generating plant, a method of controlling a power-generating plant, and a power-generating plant control progra...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To provide a control system of a power-generating plant capable of suppressing a response lag of an actual power generation amount with respect to a target power generation amount, a power-generating plant, a method of controlling a power-generating plant, and a power-generating plant control program.SOLUTION: A control system 50 of a power-generating plant 1 equipped with a steam turbine 10, a first power generator 11, a gas turbine 14, and a second power generator 16, includes an obtaining portion that obtains a target power generation amount with respect to the power-generating plant 1, a steam turbine controlling portion, and a gas turbine controlling portion. The obtaining portion sets a power generation amount instruction value to the power-generating plant 1 when obtaining the power target generation amount raising or lowering the power generation amount of the power-generating plant 1. The steam turbine controlling portion obtains a deviation between the power generation amount of the first power generator 11 and the power generation amount instruction value. The gas turbine controlling portion corrects an output instruction value to the gas turbine so as to compensate the deviation while the power generation amount of the power-generating plant 1 that is a total amount of the power generation amount of the first power generator 11 and the second power generator 16 is raised or lowered to the target power generation amount.SELECTED DRAWING: Figure 1
【課題】目標発電量に対する実際の発電量の応答遅れを抑止可能な発電プラントの制御システム、発電プラント、発電プラントの制御方法および発電プラント制御プログラムを提供する。【解決手段】蒸気タービン10と、第1発電機11と、ガスタービン14と、第2発電機16とを備える発電プラント1の制御システム50であって、発電プラント1に対する目標発電量を取得する取得部と、蒸気タービン制御部と、ガスタービン制御部とを備え、取得部は、発電プラント1の発電量を上昇または降下させる目標発電量を取得すると発電プラント1に対する発電量指令値を設定し、蒸気タービン制御部は、第1発電機11の発電量と発電量指令値との偏差を取得し、ガスタービン制御部は、第1発電機11および第2発電機16の発電量の合計である発電プラント1の発電量が目標発電量まで上昇または降下する間、偏差を補償するようにガスタービンに対する出力指令値を補正する。【選択図】図1 |
---|