GROUND STRUCTURE AND CONSTRUCTION METHOD THEREOF
SOLUTION: A ground structure consists of a base consisting of arranged concrete blocks and artificial turf fixed to the base. The concrete block contains cement, sand, and inorganic water retaining materials, and has a water permeability coefficient of 1.0×10-4 m/s or more and 10.0×10-4 m/s or less...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | SOLUTION: A ground structure consists of a base consisting of arranged concrete blocks and artificial turf fixed to the base. The concrete block contains cement, sand, and inorganic water retaining materials, and has a water permeability coefficient of 1.0×10-4 m/s or more and 10.0×10-4 m/s or less measured in accordance with JIS A 5371; further, the water retention amount measured in accordance with JIS A 5371 is 0.10 g/cm3 or more and 0.40 g/cm3 or less. The artificial turf is composed of a base cloth made of synthetic resin and having water-passing holes and synthetic resin piles fixed to the base cloth.EFFECT: To provide a ground structure with low temperature rise due to solar radiation.SELECTED DRAWING: Figure 2
【解決手段】 グラウンド構造は、配列されたコンクリートブロックから成る基盤と、基盤に固定された人工芝とから成る。コンクリートブロックはセメントと砂と無機保水材とを含み、JIS A 5371に準拠して測定した透水係数が1.0×10-4m/s以上で10.0×10-4m/s以下、かつJIS A 5371に準拠して測定した保水量が0.10g/cm3以上で0.40g/cm3以下である。人工芝は、合成樹脂製で通水孔を有する基布と、基布に固定された合成樹脂パイルとから成る。【効果】 日射による温度上昇が少ないグラウンド構造を提供する。【選択図】 図2 |
---|