REINFORCEMENT ARRANGEMENT SUPPORT SYSTEM AND REINFORCING BAR PROCESSING SUPPORT METHOD
To provide a reinforcement arrangement support system and a reinforcement arrangement support method capable of efficiently advancing reinforcing bar construction than before.SOLUTION: A reinforcement arrangement support system 1 includes: an input unit 2 which receives an input of structure data of...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To provide a reinforcement arrangement support system and a reinforcement arrangement support method capable of efficiently advancing reinforcing bar construction than before.SOLUTION: A reinforcement arrangement support system 1 includes: an input unit 2 which receives an input of structure data of a target structure 10; an arithmetic unit 3 which calculates reinforcement arrangement data for the target structure 10 from the structure data input to the input unit 2; a display unit 4 which displays a reinforcement arrangement model in which reinforcing bars 20 are arranged in the structure 10 at least from a result calculated by the arithmetic unit 3; and an adjustment unit 5 which adjusts the result calculated by the arithmetic unit 3. The adjustment unit 5 transmits data for calculating the adjusted reinforcement arrangement data to the arithmetic unit 3.SELECTED DRAWING: Figure 1
【課題】 従来と比較して、鉄筋工事を効率的に進めることができる配筋支援システム及び配筋支援方法を提供する。【解決手段】 配筋支援システム1は、対象とする構造物10の構造データを入力する入力部2と、入力部2に入力された構造データから対象とする構造物10に対する配筋データを演算する演算部3と、演算部3が演算した結果から少なくとも構造物10に鉄筋20を設置した配筋モデルを表示する表示部4と、演算部3が演算した結果を調整する調整部5と、を備え、調整部5は、演算部3に調整後の配筋データを演算させるデータを送る。【選択図】図1 |
---|