SCHEDULE GENERATION APPARATUS, SCHEDULE GENERATION PROGRAM, AND SCHEDULE GENERATION METHOD

To provide a schedule generation apparatus, a schedule generation program, and a schedule generation method that can more efficiently create a schedule for each resident that meets an addition requirement.SOLUTION: A schedule generation apparatus includes: an acquisition unit 211 that acquires addit...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: MORITA MITSUTAKA
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To provide a schedule generation apparatus, a schedule generation program, and a schedule generation method that can more efficiently create a schedule for each resident that meets an addition requirement.SOLUTION: A schedule generation apparatus includes: an acquisition unit 211 that acquires addition requirement information related to a plurality of addition requirements including a first addition requirement and a second addition requirement applied to residents in a facility, and work information related to a work required for each of the plurality of addition requirements including a first work required for the first addition requirement and a second work required for the second addition requirement; a specification unit 212 that specifies the overlapping first and second works based on the addition requirement information and the work information that are acquired; and a generation unit 213 that simplifies the first and second works that are specified and generates a schedule of the works for the residents.SELECTED DRAWING: Figure 5 【課題】各入居者に対し、より効率的に加算要件を満たすスケジュールを作成可能なスケジュール生成装置、スケジュール生成プログラム、およびスケジュール生成方法を提供する。【解決手段】スケジュール生成装置は、施設の入居者に適用される第1加算要件および第2加算要件を含む複数の加算要件に関する加算要件情報と、前記第1加算要件に必要な第1作業および前記第2加算要件に必要な第2作業を含む複数の前記加算要件各々に必要な作業に関する作業情報とを取得する取得部211と、取得された前記加算要件情報および前記作業情報に基づいて、重複する前記第1作業および前記第2作業を特定する特定部212と、特定された前記第1作業および前記第2作業を簡素化して、前記入居者に対する前記作業のスケジュールを生成する生成部213とを含む。【選択図】図5