WORK UNIT CONTROL SYSTEM
To safely and smoothly handle a partial breakage of a plurality of wires supporting a work unit working at height.SOLUTION: A work unit control system has a first control unit 2, a second control unit 3, and a work unit 5 that performs works such as cleaning installed on a roof of a building 1, the...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To safely and smoothly handle a partial breakage of a plurality of wires supporting a work unit working at height.SOLUTION: A work unit control system has a first control unit 2, a second control unit 3, and a work unit 5 that performs works such as cleaning installed on a roof of a building 1, the system connects a winch 21 of the first control unit 2 and the work unit 5 with wire 41, connects a winch 31 of the second control unit 3 and the work unit 5 with wire 42, connects an auxiliary winch 22 of the first control unit 2 and a fixed part of the second control unit 3 with auxiliary wire 43, and suspends the work unit 5 on the auxiliary wire 43. Further, if the wire 41 breaks, the auxiliary wire 43 restricts the movement of the work unit so that the work unit 5 stops at a position midway between the auxiliary winch 22 of the first control unit 2 and the fixed part of the auxiliary wire 43 of the second control unit 3.SELECTED DRAWING: Figure 3
【課題】高所作業を行う作業ユニットを支える複数のワイヤの一部が破断した場合に、安全かつ円滑に対処することを課題とする。【解決手段】作業ユニット制御システムは、ビル1の屋上に設置された第1制御装置2、第2制御装置3及び清掃等の作業を行う作業ユニット5を有し、第1制御装置2のウィンチ21と作業ユニット5をワイヤ41で接続し、第2制御装置3のウィンチ31と作業ユニット5をワイヤ42で接続し、さらに第1制御装置2の補助ウィンチ22と第2制御装置3の固定部とを補助ワイヤ43で接続し、補助ワイヤ43に作業ユニット5を吊り下げている。そして、ワイヤ41が破断した場合は、補助ワイヤ43により作業ユニット5が第1制御装置2の補助ウィンチ22と第2制御装置3の補助ワイヤ43の固定部との中間の位置に停止させるように、作業ユニットの動きを制限する。【選択図】図3 |
---|