BOBBIN CONVEYING SYSTEM AND BOBBIN CONVEYING METHOD

To provide a bobbin conveying system improving efficiency of bobbin conveyance.SOLUTION: The number of rows of stocker pegs 26 provided in a stocker 20 is more than the number of rows of carriage pegs 13 with which a traveling creel carriage 10 is provided only by one. A first process and a second p...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: OKUYAMA YASUO
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To provide a bobbin conveying system improving efficiency of bobbin conveyance.SOLUTION: The number of rows of stocker pegs 26 provided in a stocker 20 is more than the number of rows of carriage pegs 13 with which a traveling creel carriage 10 is provided only by one. A first process and a second process are alternatively carried out by a conveyance control computer 40 in a state in which one row of the stocker pegs 26 has no bobbin and all of the other rows have empty bobbins 6 placed, which allows replacement of an empty bobbin 6 in the stocker 20 for a full bobbin 5 of the traveling creel carriage 10. In the first process, the full bobbins 5 placed in one row of the carriage pegs 13 are moved to one row of the stocker pegs 26 having no bobbin. In the second process, the empty bobbins 6 in one row placed in the stocker pegs 26 are moved to the carriage pegs 13 in one row where the full bobbin 5 has been picked up in the first process. The traveling creel carriage 10 conveys the full bobbin 5 to the stocker 20 to be replaced for the empty bobbin 6 in the stocker 20 and convey the empty bobbin 6.SELECTED DRAWING: Figure 2 【課題】ボビンの搬送効率を向上させる。【解決手段】ストッカ20が備えるストッカペグ26の列数は、走行クリール台車10が備える台車ペグ13の列数よりも1だけ大きい。ストッカペグ26のうち1列がボビンなし状態であり、残りの列の全てに空ボビン6が掛けられている状態で、第1工程と、第2工程と、が搬送制御コンピュータ40の制御によって交互に行われることで、ストッカ20の空ボビン6を走行クリール台車10の満ボビン5と交換する。第1工程では、1列の台車ペグ13に掛けられた満ボビン5を、ボビンなし状態となっている1列のストッカペグ26に移動させる。第2工程では、ストッカペグ26に掛けられている1列の空ボビン6を、第1工程で満ボビン5が取り出された1列の台車ペグ13に移動させる。走行クリール台車10は、満ボビン5をストッカ20に搬送してストッカ20の空ボビン6と交換して、空ボビン6を搬送する。【選択図】図2