UNDERWATER LINING STRUCTURE, AND CONSTRUCTION METHOD OF LINING BODY

To construct a space cut off from water on a water bottom.SOLUTION: A construction method of a lining body 100 provided on an underwater bottom includes: a step of arranging a plurality of plate members 10 so as to cover the underwater bottom; a step of arranging a sealing member 30 that seals a joi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: SUZUKI YOSHINOBU
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To construct a space cut off from water on a water bottom.SOLUTION: A construction method of a lining body 100 provided on an underwater bottom includes: a step of arranging a plurality of plate members 10 so as to cover the underwater bottom; a step of arranging a sealing member 30 that seals a joint gap between neighboring plate members 10 arranged on the underwater bottom and blocks water from entering; and a step of excavating the underwater bottom covered with the plate member.SELECTED DRAWING: Figure 1 【課題】水中から遮断された空間を水底に構築する。【解決手段】水中の水底に設けられる覆工体100の構築方法は、水底を覆うようにして複数の板部材10を配置する工程と、水底に配置された隣接する板部材10の間の継目隙間を封止し水の浸入を遮断する封止部材30を配置する工程と、板部材に覆われた水底を掘削する工程と、を含む。【選択図】図1