CONSTRUCTION METHOD OF DAM BODY, AND CONVEYANCE DEVICE

To provide a construction method of a dam body and a conveyance device allowing efficient construction work of the dam body.SOLUTION: The construction method of a dam body uses a concrete conveyance device having multiple conveyance pipes, multiple conveyance pipe receiving stringers and multiple co...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: AONO TAKASHI, OKAYAMA MAKOTO, ISE TAKUYA
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To provide a construction method of a dam body and a conveyance device allowing efficient construction work of the dam body.SOLUTION: The construction method of a dam body uses a concrete conveyance device having multiple conveyance pipes, multiple conveyance pipe receiving stringers and multiple columns. The conveyance pipe includes a first conveyance pipe unit 10A and a second conveyance pipe unit 10B connected to a lower part of the first conveyance pipe unit 10A. The conveyance pipe receiving stringer includes a first receiving stringer 20A facing the first conveyance pipe unit 10A, and a second receiving stringer 20B connected to the first receiving stringer 20A and facing the second conveyance pipe unit 10B. The construction method includes the steps of: releasing the connection of the second conveyance pipe unit 10B to the first conveyance pipe unit 10A; releasing the connection of the second receiving stringer 20B to the first receiving stringer 20A; and removing the second conveyance pipe unit 10B and the second receiving stringer 20B.SELECTED DRAWING: Figure 7 【課題】堤体の構築作業を効率よく行うことができる堤体の構築方法、及び搬送装置を提供する。【解決手段】一実施形態に係る堤体の構築方法は、複数の搬送管と、複数の搬送管受桁材と、複数の支柱と、を備えるコンクリートの搬送装置を用いた構築方法であって、搬送管は、第1搬送管ユニット10Aと、第1搬送管ユニット10Aの下方に接続される第2搬送管ユニット10Bとを含んでおり、搬送管受桁材は、第1搬送管ユニット10Aに対向する第1受桁材20Aと、第1受桁材20Aに連結されると共に第2搬送管ユニット10Bに対向する第2受桁材20Bとを含んでおり、第1搬送管ユニット10Aに対する第2搬送管ユニット10Bの接続を解除する工程と、第1受桁材20Aに対する第2受桁材20Bの連結を解除する工程と、第2搬送管ユニット10B及び第2受桁材20Bを撤去する工程と、を備える。【選択図】図7