METHOD FOR INSTALLING WHOLE BUILDING AIR CONDITIONING UNIT
To provide a method for installing a whole building air conditioning unit capable of improving workability into a narrow installation space regardless of a duct piping environment.SOLUTION: A blower unit 4b constituting a whole building air conditioning unit includes first chamber parts 19 each havi...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To provide a method for installing a whole building air conditioning unit capable of improving workability into a narrow installation space regardless of a duct piping environment.SOLUTION: A blower unit 4b constituting a whole building air conditioning unit includes first chamber parts 19 each having a first opening part 26 through which air-conditioned air 16 is blown out in a floor surface direction and a second opening part 27 through which the air-conditioned air 16 blown out by a blower 18 is blown out in a ceiling direction. A method for installing the whole building air conditioning unit 2b comprises: a first process of installing the blower unit 4b in an installation space 1; a second process of closing one of the first opening part 26 and the second opening part 27 (a first opening part 26b and a second opening part 27a) for each of the first chamber parts 19; a third process of communicating and connecting a duct to the other of the first opening part 26 and the second opening part 27 (a first opening part 26a and a second opening part 27b) for each of the first chamber parts 19; and a fourth process of placing an air conditioner unit 3 on a top part of the blower unit 4b installed in the first process.SELECTED DRAWING: Figure 31
【課題】ダクト配管環境によらずに、狭小設置空間内への施工性を向上させることが可能な全館空調ユニットの設置方法を提供する。【解決手段】全館空調ユニットを構成する送風機ユニット4bは、空調空気16を床面方向に吹き出す第一開口部26と、送風機18が吹き出す空調空気16を天井方向に吹き出す第二開口部27とを有する第一チャンバー部19を備える。全館空調ユニット2bの設置方法は、設置空間1内に、送風機ユニット4bを設置する第一工程と、第一チャンバー部19ごとに第一開口部26及び第二開口部27の一方(第一開口部26b及び第二開口部27a)を閉鎖する第二工程と、第一チャンバー部19ごとに第一開口部26及び第二開口部27の他方(第一開口部26a及び第二開口部27b)にダクトを連通接続する第三工程と、第一工程において設置した送風機ユニット4bの上部に空気調和機ユニット3を載置する第四工程とを備える。【選択図】図31 |
---|