FOUNDATION CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE
To provide a foundation construction method of an underground structure to be constructed in low cost even when large vertical load is partially applied thereto.SOLUTION: A foundation construction method of an underground structure includes the steps of: constructing a pile 12 by driving an undergro...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To provide a foundation construction method of an underground structure to be constructed in low cost even when large vertical load is partially applied thereto.SOLUTION: A foundation construction method of an underground structure includes the steps of: constructing a pile 12 by driving an underground piled column 21 in the ground 2 at a center area 20A and constructing an outer earth-retaining wall 30 and an inner earth-retaining wall 31 on an outer peripheral area 20B; constructing a first floor skeleton 15A through support with the underground piled column 21 at the center area 20A and excavating the ground 2 while installing a timbering 32 on the outer peripheral area 20B; installing a steel column 22 by constructing a part of a mat foundation 13 on the outer peripheral area 20B and constructing the first floor skeleton 15 through support of the steel column 22; and constructing a remaining skeleton through excavating the ground 2 at the center area 20A as well as constructing the remaining skeleton while demolishing the inner earth-retaining wall 31 and the timbering 32 on the outer peripheral area 20B.SELECTED DRAWING: Figure 7
【課題】一部に大きな鉛直荷重が作用する場合であっても、低コストで構築できる、地下構造体の基礎の構築方法を提供すること。【解決手段】地下構造体の基礎の構築方法は、中央エリア20Aにて地盤2中に構真柱21を打ち込んで杭12を構築し、外周エリア20Bにて外側山留め壁30および内側山留め壁31を構築するステップと、中央エリア20Aにて構真柱21に支持させて1階床躯体15Aを構築し、外周エリア20Bにて支保工32を架設しながら地盤2を掘削するステップと、外周エリア20Bにて、べた基礎13の一部を構築して鉄骨柱22の建方を行い、この鉄骨柱22に支持させて1階床躯体15Bを構築するステップと、中央エリア20Aにて、地盤2を掘削して残りの躯体を構築するとともに、外周エリア20Bにて、内側山留め壁31および支保工32を解体しながら残りの躯体を構築するステップと、を備える。【選択図】図7 |
---|