CONSTRUCTION MANAGEMENT METHOD, SYSTEM, PROGRAM, APPARATUS, AND RECORDING MEDIUM
To improve efficiency of periodic repair or inspection and improve operation quality.SOLUTION: A construction management method using a computer includes the steps of: creating, by an information processing unit (processing unit 10), two or more task management tables (26) specified with management...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To improve efficiency of periodic repair or inspection and improve operation quality.SOLUTION: A construction management method using a computer includes the steps of: creating, by an information processing unit (processing unit 10), two or more task management tables (26) specified with management functions, using task information recorded on a database (task information DB 24); inputting, by an information input unit (14), actual performance information for each task to a specific task management table; reflecting, by the information processing unit, the actual performance information acquired from the information input unit to one of or two or more of other task management tables; and presenting, by an information presentation unit (16), one of or two or more of the task management tables that represent transition of the actual performance information.SELECTED DRAWING: Figure 1
【課題】定修工事や検査などの効率化とともに作業品質の向上を図る。【解決手段】コンピュータを用いた工事管理方法であって、情報処理部(処理部10)が、データベース(タスク情報DB24)に記録されたタスク情報を利用して、管理機能で特定した二以上のタスク管理テーブル(26)を作成する工程と、情報入力部(14)が、特定のタスク管理テーブルにタスクごとの実績情報を入力する工程と、情報処理部が、情報入力部から取得した実績情報を他のタスク管理テーブルの何れかまたは二以上に反映させる工程と、情報提示部(16)が、実績情報の変遷を表すタスク管理テーブルの何れかまたは二以上を提示する工程を含む。【選択図】 図1 |
---|