MANAGEMENT APPARATUS, MANAGEMENT METHOD, AND MANAGEMENT PROGRAM

To improve efficiency for arithmetic processing of a job using grid computing processing.SOLUTION: A management apparatus is configured to: estimate, from operation histories of arithmetic units 105, for each of the arithmetic units 105, a continuous non-operation time zone in which the arithmetic u...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HAMANO DAISUKE, ISHIBASHI MASATO, MARUKO TAKAO, YOSHITAKE SHINSUKE, HIROSE SHINGO, MATSUKAWA TSUYOSHI, YOSHIDA KEITA
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To improve efficiency for arithmetic processing of a job using grid computing processing.SOLUTION: A management apparatus is configured to: estimate, from operation histories of arithmetic units 105, for each of the arithmetic units 105, a continuous non-operation time zone in which the arithmetic unit 105 is in non-operation state continuously in a single day, in association with a location of the arithmetic unit 105 in the continuous non-operation time zone; specify a plurality of specific arithmetic units of which the continuous non-operation time zones overlap each other in a predetermined area, out of the arithmetic units 105; and calculate the sum of computing powers of the specific arithmetic units in the overlapping continuous non-operation time zone to estimate computing power in the predetermined area.SELECTED DRAWING: Figure 14 【課題】グリッドコンピューティング処理によるジョブの演算処理を効率化する。【解決手段】複数の演算装置105の各稼働履歴から、1日のうち演算装置105が第1所定時間以上連続して非稼働状態にある連続非稼働時間帯を、連続非稼働時間帯における演算装置105の所在地と関連づけて、演算装置105毎に推定し、各演算装置105のうち、所定エリアにおいて連続非稼働時間帯が重複する複数の特定演算装置を特定し、重複する連続非稼働時間帯おける各特定演算装置の計算能力の総和をとって、所定エリアにおける計算能力を推定する。【選択図】図14