SYSTEM OF DETERMINING WARM-UP PERIOD OF POWER CONVERTER AND RELATED METHOD
To determine a warm-up period of a power converter.SOLUTION: The present disclosure relates to a method (300) of determining a warm-up period of a power converter (20) of a wind turbine (1). The method (300) comprises determining (301) a first indicator indicative of when the power converter (20) ha...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To determine a warm-up period of a power converter.SOLUTION: The present disclosure relates to a method (300) of determining a warm-up period of a power converter (20) of a wind turbine (1). The method (300) comprises determining (301) a first indicator indicative of when the power converter (20) has been inactive. Further, the method (300) comprises at least partially determining (302) the period of warming up based on the first indicator. A power converter assembly is also disclosed.SELECTED DRAWING: Figure 3
【課題】 電力コンバータのウォームアップ期間を決定する【解決手段】本開示は、風力タービン(1)の電力コンバータ(20)のウォームアップ期間を決定する方法(300)に関する。方法(300)は、電力コンバータ(20)が非アクティブであった時間を示す第1のインジケータを決定するステップ(301)を含む。さらに、方法(300)は、第1のインジケータに基づいて少なくとも部分的にウォーミングアップする期間を決定する(302)ことを含む。電力コンバータアセンブリも開示される。【選択図】図3 |
---|