CONSTRUCTION MANAGEMENT SYSTEM

To provide a construction management system capable of safely and efficiently performing construction machine work by autonomous operation.SOLUTION: A construction management system 10 includes: a plurality of construction machines 11 that perform work by autonomous operation at a construction site;...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HADATE SEIJI, OKAMOTO KUNIHIRO
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To provide a construction management system capable of safely and efficiently performing construction machine work by autonomous operation.SOLUTION: A construction management system 10 includes: a plurality of construction machines 11 that perform work by autonomous operation at a construction site; a management device 12 that can be operated by an operator; and a platform 13 to which the plurality of construction machines 11 and the management device 12 are communicably connected. Each construction machine 11 is configured to acquire its self-position and to be able to transmit the acquired self-position to the platform 13. The management device 12 is configured to be able to transmit safety priorities for the plurality of construction machines 11 to the platform 13. During operation of each construction machine 11, the platform 13 determines whether or not an emergency stop is necessary for each construction machine 11 based on the self-position and the safety priority of each construction machine 11, and makes an emergency stop of the construction machine 11 that needs the emergency stop.SELECTED DRAWING: Figure 1 【課題】自律運転による建機の作業を安全に、かつ、効率よく行うことのできる施工管理システムを提供する。【解決手段】施工管理システム10は、施工現場において自律運転により作業を行う複数の建機11と、オペレータが操作可能な管理装置12と、複数の建機11と管理装置12とが通信可能に接続されたプラットフォーム13と、を備える。各建機11は、自己位置を取得し、取得した自己位置をプラットフォーム13に送信可能に構成される。管理装置12は、複数の建機11についての安全優先順位をプラットフォーム13に送信可能に構成される。プラットフォーム13は、各建機11の作業中、各建機11の自己位置と安全優先順位とに基づいて各建機11について緊急停止の要否を判断し、緊急停止が必要な建機11を緊急停止させる。【選択図】図1