VENTILATION METHOD INSIDE TUNNEL DURING TUNNEL CONSTRUCTION

To effectively perform ventilation inside a tunnel during assembly and dismantling of an arch center.SOLUTION: When constructing lining concrete on an inner peripheral surface of a tunnel using an arch center 11, air in the tunnel is ventilated by a ventilation duct 21 extending in an extension dire...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: TSUCHIDA MINORU
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To effectively perform ventilation inside a tunnel during assembly and dismantling of an arch center.SOLUTION: When constructing lining concrete on an inner peripheral surface of a tunnel using an arch center 11, air in the tunnel is ventilated by a ventilation duct 21 extending in an extension direction of the tunnel and an air blower connected to the ventilation duct 21. The ventilation duct 21 is placed on a ground T1 between an inner wall of the tunnel and an arch center installation position T2 when the arch center 11 is assembled and dismantled. The ventilation duct 21 is passed under outriggers R2 of a crane R located in the tunnel.SELECTED DRAWING: Figure 2 【課題】セントルの組立及び解体時にトンネル内の換気を有効に行うようにすること。【解決手段】セントル11を用いてトンネルの内周面に覆工コンクリートを施工するときに際して、トンネルの延長方向に延びる換気ダクト21と、その換気ダクト21に接続された送風機とよりそのトンネル内の空気を換気する。そして、その換気をセントル11の組立及び解体時に、前記換気ダクト21を前記トンネルの内壁と前記セントル設置位置T2との間における地面T1上に配する。換気ダクト21は、トンネル内に位置するクレーンRのアウトリガーR2の下側を通される。【選択図】図2