METHOD FOR CONSTRUCTING STRUCTURE AND STRUCTURE
To provide a method for constructing a structure, a structure, etc., in which tendons can be easily arranged.SOLUTION: After constructing a base slab 1 provided with a fixing hole 11, a precast block 2 provided with an insertion hole 21 communicating with the fixing hole 11 is installed on the base...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To provide a method for constructing a structure, a structure, etc., in which tendons can be easily arranged.SOLUTION: After constructing a base slab 1 provided with a fixing hole 11, a precast block 2 provided with an insertion hole 21 communicating with the fixing hole 11 is installed on the base slab 1 to construct a wall body 20. Then, a PC steel stranded wire 3 is inserted into the insertion hole 21 and the fixing hole 11, the fixing hole 11 is filled with a filler 4, and a lower end of the PC steel stranded wire 3 is fixed to the base slab 1. Next, the PC steel stranded wire 3 is tensioned, and an upper end of the PC steel stranded wire 3 is fixed to the wall body 20.SELECTED DRAWING: Figure 2
【課題】緊張材を容易に配置できる構造物の構築方法および構造物等を提供する。【解決手段】定着孔11が設けられた基礎版1を構築した後、定着孔11に連通する挿通孔21が設けられたプレキャストブロック2を基礎版1上に設置して壁体20を構築する。そして、挿通孔21および定着孔11にPC鋼撚り線3を挿入し、定着孔11に充填材4を充填してPC鋼撚り線3の下端部を基礎版1に定着する。次にPC鋼撚り線3を緊張し、PC鋼撚り線3の上端部を壁体20に定着する。【選択図】図2 |
---|