MANAGEMENT DEVICE, MANAGEMENT METHOD, AND MANAGEMENT PROGRAM

To achieve load leveling on the entire power system.SOLUTION: A management device 10 includes a plan creation part 15A. The plan creation part 15A creates a recharge/discharge plan for storage batteries 25 and a power generation plan for power generation systems 20 that maximize a predicted value of...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SHIMOO TAKAHIRO, HASEGAWA YUTA, SHIGA YOSHIAKI, OBA TAKESHI, MOTOMIYA TAKUYA, MURAI MASAHIKO
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To achieve load leveling on the entire power system.SOLUTION: A management device 10 includes a plan creation part 15A. The plan creation part 15A creates a recharge/discharge plan for storage batteries 25 and a power generation plan for power generation systems 20 that maximize a predicted value of the revenue from electricity sales for each power generation system 20, which has a PV 26 and the storage battery 25 to be charged only by the PV 26, on the basis of a forecasted power generation value of the PV 26 and a unit price of power sold.SELECTED DRAWING: Figure 2 【課題】電力系統全体の負荷平準化を図る。【解決手段】管理装置10は、計画作成部15Aを備える。計画作成部15Aは、PV26とPV26のみから充電される蓄電池25とを有する発電システム20ごとに、PV26の発電予測値および電力売電単価に基づいて、売電収益の予測値を最大化する蓄電池25の充放電計画および発電システム20の発電計画を作成する。【選択図】図2