WELL DRILLING METHOD, CONSTRUCTION METHOD AND WELL CONSTRUCTION PILE
To provide a well drilling method, a construction method and a well construction pile.SOLUTION: A well drilling method includes: a through-hole formation step of forming a well construction pile 1 by forming a through-hole 2 in a body part 10 of a tubular pile having the tubular body part 10 whose t...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To provide a well drilling method, a construction method and a well construction pile.SOLUTION: A well drilling method includes: a through-hole formation step of forming a well construction pile 1 by forming a through-hole 2 in a body part 10 of a tubular pile having the tubular body part 10 whose tip is closed; a sealing step of sealing the through-hole 2 with a plug member 3; and a driving step of driving the well construction pile 1 into the ground from the tip side.SELECTED DRAWING: Figure 1
【課題】削井方法、建築方法及び井戸構築用杭を提供する。【解決手段】先端が閉塞された管状の本体部10を有する管状杭の本体部10に貫通孔2を形成して井戸構築用杭1を形成する貫通孔形成工程と、貫通孔2を栓部材3で封止する封止工程と、先端側から井戸構築用杭1を地盤に打ち込む打込工程と、を含む削井方法。【選択図】図1 |
---|