PROTECTION STRUCTURE OF UNDERGROUND CONTINUOUS WALL, AND CONSTRUCTION METHOD OF UNDERGROUND CONTINUOUS WALL

To provide a protection structure of an underground continuous wall and a construction method of an underground continuous wall in which a joint member can be inserted without being separated from a protection member when inserting a joint member, and a protection member can be easily removed when r...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ABE KAZUSHIGE, MANO HIDEYUKI
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To provide a protection structure of an underground continuous wall and a construction method of an underground continuous wall in which a joint member can be inserted without being separated from a protection member when inserting a joint member, and a protection member can be easily removed when removing a protection member.SOLUTION: A first protrusion 45 is provided at a lower end part 411 of a joint member 4. A front groove portion 666 (a first groove portion) is formed in a protection member 6. The first protrusion 45 is inserted into the front groove portion 666 from the above, can vertically move along the front groove portion 666, and can be discharged downward from a lower end of the front groove portion 666. In a state of inserted into the front groove portion 666, the first protrusion 45 is restrained from moving in a direction from a following element 3 side toward a preceding element side to the front groove portion 666. When the joint member 4 is installed in a ground 11, the first protrusion 45 is inserted into the front groove portion 666 from the above to descend along the front groove portion 666, and the first protrusion 45 is positioned below the protection member 6 (the front groove portion 666).SELECTED DRAWING: Figure 4 【課題】継手部材挿入時には継手部材を保護部材と離れることなく挿入できるとともに、保護部材撤去時には保護部材を容易に撤去することができる地中連続壁の保護構造および地中連続壁の施工方法を提供する。【解決手段】継手部材4の下端部分411には、第1突出部45が設けられ、保護部材6には、前溝部666(第1溝部)が形成され、第1突出部45は、前溝部666に上方から挿入されて、前溝部666に沿って上下方向に移動可能であるとともに、前溝部666の下端から下方に排出可能であり、前溝部666に挿入された状態では、前溝部666に対して後行エレメント3側から先行エレメント側に向かう方向の移動が拘束され、継手部材4は、地盤11に設置される際に、第1突出部45が前溝部666に上方から挿入されて前溝部666に沿って下降し、第1突出部45が保護部材6(前溝部666)よりも下方となる位置に設置される。【選択図】図4