PANEL UNIT AND METHOD OF CONSTRUCTING STRUCTURE

To provide a panel unit capable of properly resisting placing pressure of concrete.SOLUTION: A bridge pier is constructed by a step of performing basic assembly of a panel unit 1, a step of installing the panel unit 1 to a construction site of the bridge pier, and a step of placing concrete 5 inside...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: MITSUYAMA YOSHIKI, SATO TADAHIRO, KANEKO KOICHI, YAMAZAKI KEIJI, KITAMURA TAKESHI, YANO KAZUMASA, WATANABE ARIHISA, MANCHU NAOYA
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To provide a panel unit capable of properly resisting placing pressure of concrete.SOLUTION: A bridge pier is constructed by a step of performing basic assembly of a panel unit 1, a step of installing the panel unit 1 to a construction site of the bridge pier, and a step of placing concrete 5 inside a precast panel 31 using the panel unit 1 as an embedded form frame. The panel unit 1 comprises a reinforcement bar of the bridge pier and a plurality of precast panels 31 arranged to surround the reinforcement bar, and an external timber support 40 is attached so as to surround the precast panel 31. The external timber support 40 is removed after placement of the concrete 5.SELECTED DRAWING: Figure 13 【課題】コンクリートの打設圧に対し好適に抵抗できるパネルユニット等を提供する。【解決手段】パネルユニット1を地組する工程と、パネルユニット1を橋脚の構築箇所に移設する工程と、パネルユニット1を埋設型枠として用い、プレキャストパネル31の内側にコンクリート5を打設する工程と、により橋脚を構築する。パネルユニット1は、橋脚の補強筋と、当該補強筋を囲むように配置された複数のプレキャストパネル31を有し、プレキャストパネル31を囲むように外部支保工40が取付けられたものである。外部支保工40は、コンクリート5の打設後に撤去する。【選択図】図13