CONNECTION STRUCTURE OF TUNNEL SUPPORT AND CONSTRUCTION METHOD OF TUNNEL SUPPORT

To provide a connection structure of a tunnel support and a construction method of the tunnel support that make it possible to connect a pair of split supports easily, efficiently, and with high accuracy.SOLUTION: In a connection structure 100 of a tunnel support, a first joint plate 15 and a second...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: UCHIDA MASATAKA, MOCHIDA YUKI, MIYAMOTO SHINGO, MARUYAMA OSAMU, WAKAYAMA MASANORI, MIYATA KATSUHARU
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To provide a connection structure of a tunnel support and a construction method of the tunnel support that make it possible to connect a pair of split supports easily, efficiently, and with high accuracy.SOLUTION: In a connection structure 100 of a tunnel support, a first joint plate 15 and a second joint plate 25 of a first split support 10 and a second split support 20 having an arc-shape are connected. A through hole 27 is opened in the second joint plate 25, and a male member 30 inserted into the through hole 27 is projected in the first joint plate 15. The male member 30 is provided with an accommodating groove 34. The accommodating groove 34 is communicated with a side surface opening 35. A pair of claws 40 is arranged so as to be freely moved in and out of the accommodating groove 34 through the side surface opening 35 in the accommodating groove 34. An end portion of a base portion side of the pair of claws 40 is urged by an elastic material 50 and overhangs outward through the side surface opening 35. The male member 30 is inserted into the through hole 27 and wide width surfaces of the first joint plate 15 and the second joint plate 25 abut with each other, and the end portion of the pair of the claws 40 engages or faces the wide width surface 26 of the second joint plate 25.SELECTED DRAWING: Figure 8 【課題】一対の分割支保工の連結を、簡易、効率的かつ高精度に行うことを可能とする、トンネル支保工の連結構造とトンネル支保工の施工方法を提供する。【解決手段】円弧状の第一分割支保工10と第二分割支保工20の第一継手板15と第二継手板25が連結されたトンネル支保工の連結構造100であり、第二継手板25には貫通孔27が開設され、第一継手板15には貫通孔27に挿通される雄部材30が突設し、雄部材30は収容溝34を備え、収容溝34は側面開口35に連通し、収容溝34には一対の爪40が側面開口35を介して収容溝34の内外に出入り自在に配設され、一対の爪40の基部側の端部が弾性材50によって付勢されて側面開口35を介して外側に張り出し、雄部材30が貫通孔27に挿通され、第一継手板15と第二継手板25の広幅面同士が当接し、一対の爪40の前記端部が第二継手板25の広幅面26に係合もしくは対向している。【選択図】図8