FRAME MOLD FOR CONCRETE INSTALLATION AND CONSTRUCTION METHOD THEREOF

To save labor in construction or replacement work of a frame mold for concrete installation.SOLUTION: A frame mold for concrete installation 100 comprises a sheathing board 10 for sheathing the concrete, a cross rail 30 extending along the sheathing board 10 and supporting the sheathing board agains...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ONODERA TOSHIYUKI, ARIE NOBUAKI, MURAKI HIDETOSHI, KAKEYA MAKOTO, SATO TAKAHIRO, TAKEMOTO AKIRA
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To save labor in construction or replacement work of a frame mold for concrete installation.SOLUTION: A frame mold for concrete installation 100 comprises a sheathing board 10 for sheathing the concrete, a cross rail 30 extending along the sheathing board 10 and supporting the sheathing board against pressure of the concrete, a short material 40 shorter than the cross rail 30 and arranged along the cross rail 30, a washer 50 provided across the cross rail 30 and the short material 40 to support the cross rail 30 and the short material 40, and a fastener 60 fastened across the sheathing board 10 and the washer 50 and pressing the washer 50 toward the sheathing board 10.SELECTED DRAWING: Figure 2 【課題】コンクリート打設用型枠の構築や盛替え作業を省力化する。【解決手段】コンクリート打設用型枠100は、コンクリートをせき止めるせき板10と、せき板10に沿って延在して設けられ、コンクリートの圧力に抗してせき板を支持する横桟30と、横桟30よりも短く形成され、横桟30に沿って配置された短材40と、横桟30と短材40とに渡って設けられ、横桟30及び短材40を支持する座金50と、せき板10と座金50とに渡って締結され、座金50をせき板10に向けて押圧する締結具60と、を備える。【選択図】図2