WORK INTEGRATION MANAGEMENT SYSTEM

To provide a work integration management system that emphasizes correction of a work plan due to an uncertain element even if an initial plan is established by an OR method and an operation is performed using Patent Document 1.SOLUTION: A work integration management system for performing and managin...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: KAIDA TOMOJI, TAYAMA MUNENORI, SEKI HIROSHI, KUROSAWA KOICHI, ODAI MASAKI, NAGAI TAKAHIRO, KOBAYASHI RYOSUKE, USUDA HARUKA, KIMURA NOBUTAKA, HIRANO KATSUHIKO, KASAHARA TAKAYASU, ISHIZUKA IPPEI
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To provide a work integration management system that emphasizes correction of a work plan due to an uncertain element even if an initial plan is established by an OR method and an operation is performed using Patent Document 1.SOLUTION: A work integration management system for performing and managing work with many uncertain elements includes at least one or more functions of: a work plan correction function for correcting an initial work plan for a purpose of obtaining a better optimum solution after a plan and achievements are compared and evaluated relative to the initial work plan; a three-axis evaluation function for deriving and presenting an optimum solution in consideration of one more restriction function in addition to evaluation by two axes of two restriction functions; and a middle and long-term resource arrangement function for formulating a short-term optimum resource arrangement in operation and the middle and long-term resource arrangement plan.SELECTED DRAWING: Figure 1 【課題】OR手法により初期計画を策定し、かつ特許文献1を採用した作業を実行するにしても、不確定要素による作業計画の修正を重視した作業統合管理システムであることが望まれる。【解決手段】不確定要素の多い作業を遂行管理するための作業統合管理システムであって、初期作業計画に対し、計画と実績を比較評価した上で、より良い最適解を得ることを目的として前記初期作業計画を修正する作業計画修正機能と、2つの制約関数の2軸による評価に加え、さらにもう1つの制約関数も考慮して最適解を導出、提示する3軸評価機能と、作業時の短期的な最適リソース配置、ならびに中長期的に見て最適なリソース配置計画を策定する中長期的リソース配置計画機能のうち、少なくとも1つ以上の機能を備えることを特徴とする作業統合管理システム。【選択図】図1