POWER DISTRIBUTION SYSTEM AND SLAVE STATION

To provide a power distribution system which can appropriately eliminate an accident in a distribution line, even if an abnormality occurs in one switch which is provided on a long distribution line.SOLUTION: The power distribution system includes: a plurality of slave stations provided correspondin...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HIKITA TAKEO, HIGUCHI HIROSHI
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To provide a power distribution system which can appropriately eliminate an accident in a distribution line, even if an abnormality occurs in one switch which is provided on a long distribution line.SOLUTION: The power distribution system includes: a plurality of slave stations provided corresponding to a plurality of switches for dividing a long distribution line connected to the bus of a distribution substation into a plurality of sections; and a master station configured to be communicable with the plurality of slave stations. A first slave station among the plurality of slave stations accepts a current input detected at the distribution line, and outputs an open command to a first switch corresponding to the first slave station if the detected current is included within a reference range. When the first switch is not opened by the lapse of a first period after the open command is output, the first slave station requests a second slave station, which is adjacent to the first slave station on the bus side, to output an open command to a second switch corresponding to the second slave station.SELECTED DRAWING: Figure 6 【課題】長亘長の配電線に設けられた1の開閉器に異常が発生している場合であっても、当該配電線における事故を適切に除去することが可能な配電システムを提供する。【解決手段】配電システムは、配電用変電所の母線に接続された長亘長の配電線を複数の区間に区分する複数の開閉器にそれぞれ対応して設けられた複数の子局と、複数の子局と通信可能に構成された親局とを備える。複数の子局のうちの第1子局は、配電線において検出された電流の入力を受け付け、検出された電流が基準範囲に含まれる場合に、第1子局に対応する第1開閉器へ開放指令を出力し、開放指令が出力されてから第1の時間が経過するまでに第1開閉器が開放されない場合、第1子局に母線側で隣接する第2子局に対して、当該第2子局に対応する第2開閉器へ開放指令を出力するように要求する。【選択図】図6