FIXTURE FOR TUNNEL MANAGEMENT PASSAGE
To provide a fixture for a tunnel management passage having high dimensional accuracy.SOLUTION: A fixture for a tunnel management passage 100 is structured with cardboard members, and has a frame body 1 installed at the opening of a tunnel and a flatly formed fixture body 3 rotated around a rotation...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To provide a fixture for a tunnel management passage having high dimensional accuracy.SOLUTION: A fixture for a tunnel management passage 100 is structured with cardboard members, and has a frame body 1 installed at the opening of a tunnel and a flatly formed fixture body 3 rotated around a rotation axis of one side in the width direction to open/close the other side in the width direction. The frame body 1 has an upper frame 10 installed above the opening and vertical frames 20 installed at both ends in the width direction of the opening. Each of the upper frame 10 and the vertical frames 20 has flatly formed frame face material parts 11 and 21 and frame edge parts 12, 22 and 24 curvedly provided from outer edges of the frame face material parts 11 and 21 and arranged along the opening.SELECTED DRAWING: Figure 2
【課題】寸法精度が良いトンネルの管理通路用建具を提供する。【解決手段】トンネルの管理通路用建具100は、段ボール部材で構成されたトンネルの管理通路用建具であって、トンネルの開口部に設置される枠体1と、平板状に形成され、幅方向の一方側を回動軸として回動軸回りに回動して記幅方向の他方側が開閉可能とされた建具本体3と、を備え、枠体1は、開口部の上部に設置される上枠10と、開口部の幅方向の両端部に設置される縦枠20と、を有し、上枠10及び縦枠20には、それぞれ平板状に形成された枠面材部11,21、及び枠面材部11,21の外縁から屈曲して設けられ、開口部に沿って配置された枠縁部12,22,24が設けられていることを特徴とする。【選択図】図2 |
---|