BUILDING CONSTRUCTION METHOD

To provide a building construction method capable of blocking flowing-out of an alkaline component eluted from cement use parts of a foundation and an accompanying skeleton built in a drilling pit to the ground.SOLUTION: A construction method of a building 1 for blocking flowing-out of an alkaline c...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: TSUJI KEIJI, MAKI TATSUYA, KAWARABAYASHI JUNKO, AKAHORI TAKUMI
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To provide a building construction method capable of blocking flowing-out of an alkaline component eluted from cement use parts of a foundation and an accompanying skeleton built in a drilling pit to the ground.SOLUTION: A construction method of a building 1 for blocking flowing-out of an alkaline component eluted from cement use parts of the building 1 to the ground G includes: drilling the ground G to construct a drilling pit P; and constructing a foundation 2 and an accompanying skeleton 3 in the drilling pit P in a state where an impermeable layer 6 is interposed between the ground G and all the cement use parts of the foundation 2 of the building 1 and the skeleton 3 accompanying construction of the building 1.SELECTED DRAWING: Figure 1 【課題】掘削ピット内に構築される基礎および付随躯体のセメント使用部分から溶出するアルカリ成分が地盤へ流出するのを遮断する建築物の構築方法の提供。【解決手段】建築物1のセメント使用部分から溶出するアルカリ成分の地盤Gへの流出を遮断する建築物1の構築方法であって、地盤Gを掘削して掘削ピットPを構築し、掘削ピットP内において、建築物1の基礎2および建築物1の構築に付随する付随躯体3のセメント使用部分の全てと地盤Gとの間に不透水層6を介在させた状態で、基礎2および付随躯体3を構築する。【選択図】図1