GROUND IMPROVEMENT METHOD

To provide a ground improvement method that can reduce construction costs and construction periods.SOLUTION: The ground improvement method includes a step of pressing a ground 1 by installing a long and hollow casing pipe 3 vertically using a drain construction machine in the ground 1 around an inte...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: OKABAYASHI IKUO, TAGAMI MINORU
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To provide a ground improvement method that can reduce construction costs and construction periods.SOLUTION: The ground improvement method includes a step of pressing a ground 1 by installing a long and hollow casing pipe 3 vertically using a drain construction machine in the ground 1 around an intermediate point between vertical drains 2. The drain construction machine comprises a vibro-hammer and collects water in the ground around the vertical drains 2 using vibration from the vibro-hammer when installing the casing pipe 3.SELECTED DRAWING: Figure 1 【課題】施工コストを抑制することができ、施工期間も短縮することができる地盤改良方法を提供する。【解決手段】地盤改良方法は、バーチカルドレーン2同士の中間付近の地盤1に、ドレーン施工機材によって長尺な空のケーシングパイプ3を鉛直方向に打設して周囲の地盤1を加圧する工程を含む。前記ドレーン施工機材は、バイブロハンマーを備え、ケーシングパイプ3を打設する際のバイブロハンマーによる振動によって、バーチカルドレーン2の周辺に地盤中の水分を集める。【選択図】図1