GROUND IMPROVEMENT METHOD
To provide a ground improvement method that can reduce construction costs and construction periods.SOLUTION: The ground improvement method includes a step of pressing a ground 1 by installing a long and hollow casing pipe 3 vertically using a drain construction machine in the ground 1 around an inte...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To provide a ground improvement method that can reduce construction costs and construction periods.SOLUTION: The ground improvement method includes a step of pressing a ground 1 by installing a long and hollow casing pipe 3 vertically using a drain construction machine in the ground 1 around an intermediate point between vertical drains 2. The drain construction machine comprises a vibro-hammer and collects water in the ground around the vertical drains 2 using vibration from the vibro-hammer when installing the casing pipe 3.SELECTED DRAWING: Figure 1
【課題】施工コストを抑制することができ、施工期間も短縮することができる地盤改良方法を提供する。【解決手段】地盤改良方法は、バーチカルドレーン2同士の中間付近の地盤1に、ドレーン施工機材によって長尺な空のケーシングパイプ3を鉛直方向に打設して周囲の地盤1を加圧する工程を含む。前記ドレーン施工機材は、バイブロハンマーを備え、ケーシングパイプ3を打設する際のバイブロハンマーによる振動によって、バーチカルドレーン2の周辺に地盤中の水分を集める。【選択図】図1 |
---|