PRESS MOLDING METHOD AND PRESS MOLDING DEVICE
To provide a press molding method and a press molding device that can discharge a product, with a simple structure.SOLUTION: In a punching step, a product is punched out from a work-piece 100 by a second die 61 on which the conveyed work-piece 100 is placed, a second punch 71 provided to be movable...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To provide a press molding method and a press molding device that can discharge a product, with a simple structure.SOLUTION: In a punching step, a product is punched out from a work-piece 100 by a second die 61 on which the conveyed work-piece 100 is placed, a second punch 71 provided to be movable back and forth with respect to the second die 61, and a back pressure part 80 that applies back pressure to the work-piece 100. In a displacing step, when the second punch 71 retreats from the second die 61, the work-piece 100 is displaced to above the second die 61. In a protruding part setting step, prior to the punching step, a protruding part 101 protruding downward is formed at a place that is closer to an upstream than a punching scheduled part of the work-piece 100 and is lined up with the punching scheduled part, in a conveying direction of the work-piece 100. In a discharging step, the product is pushed out toward a downstream in the conveying direction and discharged to the outside, by the protruding part 101 displaced toward the downstream in the conveying direction together with the work-piece 100.SELECTED DRAWING: Figure 1
【課題】簡易な構成で製品を排出することができるプレス成形方法及びプレス成形装置を提供する。【解決手段】打ち抜き工程において、搬送されたワーク100が載置される第2ダイ61、第2ダイ61に対して進退可能に設けられる第2パンチ71、及びワーク100に背圧を付与する背圧部80によりワーク100から製品を打ち抜くようにした。変位工程において、第2パンチ71が第2ダイ61から退避する際に、ワーク100を第2ダイ61の上方に変位させるようにした。突部設定工程において、打ち抜き工程に先立ち、ワーク100の搬送方向において、ワーク100の打ち抜き予定部よりも上流側、且つ打ち抜き予定部と並ぶ部分に、下方に向けて突出する突部101を設けるようにした。排出工程において、ワーク100と共に搬送方向の下流側に変位する突部101により製品を搬送方向の下流側に向けて押し出して外部に排出するようにした。【選択図】図1 |
---|