GATEWAY, COMMUNICATION SYSTEM, AND COMMUNICATION METHOD

To allow appropriate life-and-death monitoring to be performed even when an IoT device is in a sleep state and a load on an IoT device accommodating GW due to life-and-death monitoring to be reduced.SOLUTION: An IoT device accommodating GW 20 includes a life-and-death monitoring time management unit...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: KONO SHINYA
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To allow appropriate life-and-death monitoring to be performed even when an IoT device is in a sleep state and a load on an IoT device accommodating GW due to life-and-death monitoring to be reduced.SOLUTION: An IoT device accommodating GW 20 includes a life-and-death monitoring time management unit 21 and a communication unit 23. The life-and-death monitoring time management unit 21 sets a monitoring period to an IoT device. The communication unit 23 transmits the monitoring period set by the life-and-death monitoring time management unit 21 to the IoT device.SELECTED DRAWING: Figure 3 【課題】IoTデバイスがスリープ状態である場合にも適切な死活監視を実現するとともに、死活監視によるIoTデバイス収容GWの負荷の軽減を可能にする。【解決手段】IoTデバイス収容GW20は、死活監視時間管理部21と、通信部23と、を有する。死活監視時間管理部21は、IoTデバイスに対して、監視周期を設定する。通信部23は、死活監視時間管理部21が設定した監視周期をIoTデバイスに送信する。【選択図】図3