OPTIMIZED EQUIPMENT ARRANGEMENT SYSTEM, OPTIMIZED EQUIPMENT ARRANGEMENT SUPPORT SYSTEM, MARKET AND MARKET MANAGEMENT METHOD USING OPTIMIZED EQUIPMENT ARRANGEMENT SYSTEM
To realize optimized relocation from existing equipment to the latest equipment or other reusable equipment, in which an optimized equipment arrangement is configured and the optimized relocation from the existing equipment to the latest equipment considers not only energy consumption efficiency but...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To realize optimized relocation from existing equipment to the latest equipment or other reusable equipment, in which an optimized equipment arrangement is configured and the optimized relocation from the existing equipment to the latest equipment considers not only energy consumption efficiency but also other factors, from the point of view of the entire system.SOLUTION: An optimized equipment arrangement system is configured: to obtain market service amount information from energy saving conversion amount information, relocation cost information required for relocation, and market service information to obtain three factors of relocation effect; to form optimized arrangement information of energy saving base arrangement equipment in a base group based on the three factors of relocation effect; and to relocate the energy saving base arrangement equipment to the current base arrangement equipment arranged at the contract base in the base group to configure the optimized equipment arrangement in the base group based on the optimized arrangement information in the base loop.SELECTED DRAWING: Figure 1
【課題】システム全体の観点から、機器最適化配置を構成させ、既存の設備機器から最新の設備機器への最適化配置転換がエネルギー消費効率ばかりでなく他の要因も考慮された、既存の設備機器から最新の設備機器あるいは他の再使用可能な設備機器への最適化配置転換を実現する。【解決手段】省エネ換算金額情報、配置換えに要する配置換え費用情報及び市場サービス情報から市場サービス金額情報を取得して配置換え影響三要因を取得し、配置換え影響三要因に基づいて省エネ拠点配置機器の拠点グループ内最適化配置情報を形成し、当該拠点ループ内最適化配置情報から、拠点グループ内の契約拠点に配置された現状拠点配置機器に省エネ拠点配置機器を配置換えして拠点グループ内の機器最適化配置を構成させる【選択図】図1 |
---|