CONSTRUCTION METHOD OF CONCRETE STRUCTURE
To provide a construction method of a concrete structure for reasonably setting change points of strength of installed concrete in a case where concrete with different strength is installed continuously in a height direction.SOLUTION: A construction method of a concrete structure for jointing an upp...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To provide a construction method of a concrete structure for reasonably setting change points of strength of installed concrete in a case where concrete with different strength is installed continuously in a height direction.SOLUTION: A construction method of a concrete structure for jointing an upper concrete 3 on a lower concrete 2 comprises: a first step of installing the lower concrete 2 up to a prescribed height; a second step of starting installation of the upper concrete 3 from a lower part of an installation face 2a of the lower concrete 2 and pushing a part of the lower concrete 2 up to a change completion height H; and a third step of installing the upper concrete 3 above the change completion height H.SELECTED DRAWING: Figure 2
【課題】強度が異なるコンクリートを高さ方向で連続して打設する場合において、打設コンクリートの強度の変化点を合理的に設定するコンクリート構造物の構築方法を提案する。【解決手段】下部コンクリート2の上に上部コンクリート3を打ち継ぐコンクリート構造物の構築方法であって、所定高さまで下部コンクリート2を打設する第一工程と、下部コンクリート2のコンクリート打設面2aよりも下方から上部コンクリート3の打設を開始して、下部コンクリート2の一部を切替完了高さHまで押し上げる第二工程と、切替完了高さHの上方に上部コンクリート3を打設する第三工程とを備えている。【選択図】図2 |
---|