MULTI-MODULAR POWER PLANT WITH DEDICATED ELECTRICAL GRID
To avoid increasing the cost and complexity of the reactor design.SOLUTION: An electrical distribution system includes multiple on-site nuclear power modules that generate a power plant output. One or more of the modules are designated as service module units that generate a first portion of the pow...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To avoid increasing the cost and complexity of the reactor design.SOLUTION: An electrical distribution system includes multiple on-site nuclear power modules that generate a power plant output. One or more of the modules are designated as service module units that generate a first portion of the power plant output, and the remainder of the nuclear power modules generates a second portion of the power plant output. Multiple power plant systems operate using electricity associated with a house load of the power plant. A switchyard electrically connects the power plant to a distributed electrical grid. The distributed electrical grid services distributed consumers. The switchyard applies the second portion of the power plant output to the distributed electrical grid, and applies at least part of the first portion of the power plant output to the power plant systems during a loss of power.SELECTED DRAWING: Figure 10
【課題】原子炉設計のコスト及び複雑さが増さないようにする。【解決手段】電力分配システムにおいて、発電プラント出力を生成する複数のオンサイト原子力発電モジュールを備える。そのモジュールの一つ以上が、発電プラント出力の第1の部分を生成するように構成されたサービスモジュールユニットとして指定される。残りのモジュールは、発電プラント出力の第2の部分を生成する。複数の発電プラントシステムが、発電プラントの所内負荷に関連する電気を使用して動作するように構成される。開閉所が、発電プラントを分散型電力網に電気的に接続するように構成される。分散型電力網は、分散した消費者にサービスするように構成され、開閉所は、発電プラント出力の第2の部分を分散型電力網に適用するように構成される。開閉所は、電力の喪失中に、発電プラント出力の第1の部分の少なくとも一部分を発電プラントシステムに適用するように構成される。【選択図】図10 |
---|