FLOOR CONSTRUCTION METHOD

To provide a floor construction method that can reduce man-hours for floor construction and reduce labor involved in floor construction.SOLUTION: The floor construction method comprises a step of disposing an underfloor unit 20, in which a sleeper 12 that supports a floor panel 11 constituting the f...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: TANAKA SHUSUI, BABA MINEO
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To provide a floor construction method that can reduce man-hours for floor construction and reduce labor involved in floor construction.SOLUTION: The floor construction method comprises a step of disposing an underfloor unit 20, in which a sleeper 12 that supports a floor panel 11 constituting the floor of a building 1 and a plurality of bundles 13 that support the sleeper 12 are integrated, by laying the sleeper 12 of the underfloor unit 20 on a rising portion R of a foundation B of the building 1, a step of forming a dirt floor FL after disposing the underfloor unit 20 by placing concrete to reach to leg members 16 of the plurality of bundles 13, in a state where a restraining member 50 for suppressing variations of vertical positions of the plurality of bundles 13 due to the bending of the sleeper 12 is attached to the underfloor unit 20, and a step of installing the floor panel 11 on the sleeper 12 of the underfloor unit 20 disposed on the dirt floor FL.SELECTED DRAWING: Figure 1 【課題】床施工の工数を削減し、床施工に係る労力を軽減できる床施工方法を提供する。【解決手段】床施工方法は、建物1の床を構成する床パネル11を支持する大引12と、大引12を支持する複数の束13とを一体化した床下ユニット20の大引12を建物1の基礎Bの立ち上がり部Rに架設して、床下ユニット20を配置する工程と、床下ユニット20を配置した後に、大引12の撓みによる複数の束13の上下位置のばらつきを抑制するための拘束部材50を床下ユニット20に取り付けた状態で、複数の束13の脚部材16に達するまでコンクリートを打設して土間FLを形成する工程と、土間FLの上に配置される床下ユニット20の大引12の上に床パネル11を設置する工程と、を含む。【選択図】図1