RECONSTRUCTION METHOD
To provide a reconstruction method capable of shortening a construction period.SOLUTION: A lower part 10L of an old structure 10, which is a part at and below a prescribed height, is surrounded by a wall W of a temporary tent until an upper part of the old structure 10, which is a part at and above...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!