RECONSTRUCTION METHOD

To provide a reconstruction method capable of shortening a construction period.SOLUTION: A lower part 10L of an old structure 10, which is a part at and below a prescribed height, is surrounded by a wall W of a temporary tent until an upper part of the old structure 10, which is a part at and above...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: KAWAZOE EIICHI
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To provide a reconstruction method capable of shortening a construction period.SOLUTION: A lower part 10L of an old structure 10, which is a part at and below a prescribed height, is surrounded by a wall W of a temporary tent until an upper part of the old structure 10, which is a part at and above the prescribed height, is completely dismantled from the top. Then, the temporary tent is completed by making a roof atop the wall W. Inside the temporary tent, underground construction is performed including dismantling the lower part 10L of the old structure and dismantling an underground structure of the old structure 10.SELECTED DRAWING: Figure 5 【課題】工期の短縮を実現することのできる建て替え工法を提供する。【解決手段】旧構造物10の上から所定の高さ以上の部分である高層部を解体し終わるまでに、旧構造物10の所定の高さ以下の部分である低層部10Lを、仮設テントの壁Wで囲う。次いで、壁Wの上に屋根を作ることで仮設テントを完成させる。仮設テントの内部で、旧構造物の低層部10Lの解体と、旧構造物10の地下の構造体の解体を含める地下工事とを実行する。【選択図】図5