RECONSTRUCTION METHOD
To provide a reconstruction method capable of shortening a construction period.SOLUTION: A lower part 10L of an old structure 10, which is a part at and below a prescribed height, is surrounded by a wall W of a temporary tent until an upper part of the old structure 10, which is a part at and above...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | KAWAZOE EIICHI |
description | To provide a reconstruction method capable of shortening a construction period.SOLUTION: A lower part 10L of an old structure 10, which is a part at and below a prescribed height, is surrounded by a wall W of a temporary tent until an upper part of the old structure 10, which is a part at and above the prescribed height, is completely dismantled from the top. Then, the temporary tent is completed by making a roof atop the wall W. Inside the temporary tent, underground construction is performed including dismantling the lower part 10L of the old structure and dismantling an underground structure of the old structure 10.SELECTED DRAWING: Figure 5
【課題】工期の短縮を実現することのできる建て替え工法を提供する。【解決手段】旧構造物10の上から所定の高さ以上の部分である高層部を解体し終わるまでに、旧構造物10の所定の高さ以下の部分である低層部10Lを、仮設テントの壁Wで囲う。次いで、壁Wの上に屋根を作ることで仮設テントを完成させる。仮設テントの内部で、旧構造物の低層部10Lの解体と、旧構造物10の地下の構造体の解体を含める地下工事とを実行する。【選択図】図5 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2019138131A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2019138131A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2019138131A3</originalsourceid><addsrcrecordid>eNrjZBANcnX29wsOCQp1DvH091PwdQ3x8HfhYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxXgFGBoaWhsYWhsaGjsZEKQIA7lkfjQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>RECONSTRUCTION METHOD</title><source>esp@cenet</source><creator>KAWAZOE EIICHI</creator><creatorcontrib>KAWAZOE EIICHI</creatorcontrib><description>To provide a reconstruction method capable of shortening a construction period.SOLUTION: A lower part 10L of an old structure 10, which is a part at and below a prescribed height, is surrounded by a wall W of a temporary tent until an upper part of the old structure 10, which is a part at and above the prescribed height, is completely dismantled from the top. Then, the temporary tent is completed by making a roof atop the wall W. Inside the temporary tent, underground construction is performed including dismantling the lower part 10L of the old structure and dismantling an underground structure of the old structure 10.SELECTED DRAWING: Figure 5
【課題】工期の短縮を実現することのできる建て替え工法を提供する。【解決手段】旧構造物10の上から所定の高さ以上の部分である高層部を解体し終わるまでに、旧構造物10の所定の高さ以下の部分である低層部10Lを、仮設テントの壁Wで囲う。次いで、壁Wの上に屋根を作ることで仮設テントを完成させる。仮設テントの内部で、旧構造物の低層部10Lの解体と、旧構造物10の地下の構造体の解体を含める地下工事とを実行する。【選択図】図5</description><language>eng ; jpn</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FORMS ; FOUNDATIONS ; HANDLING BUILDING MATERIALS ON THE SITE ; HYDRAULIC ENGINEERING ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2019</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20190822&DB=EPODOC&CC=JP&NR=2019138131A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20190822&DB=EPODOC&CC=JP&NR=2019138131A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>KAWAZOE EIICHI</creatorcontrib><title>RECONSTRUCTION METHOD</title><description>To provide a reconstruction method capable of shortening a construction period.SOLUTION: A lower part 10L of an old structure 10, which is a part at and below a prescribed height, is surrounded by a wall W of a temporary tent until an upper part of the old structure 10, which is a part at and above the prescribed height, is completely dismantled from the top. Then, the temporary tent is completed by making a roof atop the wall W. Inside the temporary tent, underground construction is performed including dismantling the lower part 10L of the old structure and dismantling an underground structure of the old structure 10.SELECTED DRAWING: Figure 5
【課題】工期の短縮を実現することのできる建て替え工法を提供する。【解決手段】旧構造物10の上から所定の高さ以上の部分である高層部を解体し終わるまでに、旧構造物10の所定の高さ以下の部分である低層部10Lを、仮設テントの壁Wで囲う。次いで、壁Wの上に屋根を作ることで仮設テントを完成させる。仮設テントの内部で、旧構造物の低層部10Lの解体と、旧構造物10の地下の構造体の解体を含める地下工事とを実行する。【選択図】図5</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>FOUNDATIONS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>HYDRAULIC ENGINEERING</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2019</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZBANcnX29wsOCQp1DvH091PwdQ3x8HfhYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxXgFGBoaWhsYWhsaGjsZEKQIA7lkfjQ</recordid><startdate>20190822</startdate><enddate>20190822</enddate><creator>KAWAZOE EIICHI</creator><scope>EVB</scope></search><sort><creationdate>20190822</creationdate><title>RECONSTRUCTION METHOD</title><author>KAWAZOE EIICHI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2019138131A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; jpn</language><creationdate>2019</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>FOUNDATIONS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>HYDRAULIC ENGINEERING</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>KAWAZOE EIICHI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>KAWAZOE EIICHI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>RECONSTRUCTION METHOD</title><date>2019-08-22</date><risdate>2019</risdate><abstract>To provide a reconstruction method capable of shortening a construction period.SOLUTION: A lower part 10L of an old structure 10, which is a part at and below a prescribed height, is surrounded by a wall W of a temporary tent until an upper part of the old structure 10, which is a part at and above the prescribed height, is completely dismantled from the top. Then, the temporary tent is completed by making a roof atop the wall W. Inside the temporary tent, underground construction is performed including dismantling the lower part 10L of the old structure and dismantling an underground structure of the old structure 10.SELECTED DRAWING: Figure 5
【課題】工期の短縮を実現することのできる建て替え工法を提供する。【解決手段】旧構造物10の上から所定の高さ以上の部分である高層部を解体し終わるまでに、旧構造物10の所定の高さ以下の部分である低層部10Lを、仮設テントの壁Wで囲う。次いで、壁Wの上に屋根を作ることで仮設テントを完成させる。仮設テントの内部で、旧構造物の低層部10Lの解体と、旧構造物10の地下の構造体の解体を含める地下工事とを実行する。【選択図】図5</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng ; jpn |
recordid | cdi_epo_espacenet_JP2019138131A |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FORMS FOUNDATIONS HANDLING BUILDING MATERIALS ON THE SITE HYDRAULIC ENGINEERING REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS SCAFFOLDING SHUTTERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | RECONSTRUCTION METHOD |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-27T01%3A31%3A44IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=KAWAZOE%20EIICHI&rft.date=2019-08-22&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2019138131A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |