CRANE CONTROL SYSTEM
To provide a crane control system which enables a plurality of crane devices to smoothly operate in the same cargo handling facility and furthermore allows for avoidance of excessive total power consumption of the plurality of crane devices.SOLUTION: A crane control system (1) comprises an overall c...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To provide a crane control system which enables a plurality of crane devices to smoothly operate in the same cargo handling facility and furthermore allows for avoidance of excessive total power consumption of the plurality of crane devices.SOLUTION: A crane control system (1) comprises an overall control unit (40) that controls the operation of a plurality of crane devices so that the total power consumption of the plurality of crane devices (10) provided in a cargo handling facility falls within a specified value or less. The overall control unit (40) may calculate a predicted value of the total power consumption of the plurality of crane devices (10) provided in the cargo handling facility and may control the operation of the plurality of crane devices (10) on the basis of the predicted value.SELECTED DRAWING: Figure 1
【課題】同一の荷役施設で複数のクレーン装置を支障なく動作させつつ、複数のクレーン装置の合計電力使用量が過大になることを回避できるクレーン制御システムを提供する。【解決手段】クレーン制御システム(1)は、荷役施設に備わる複数のクレーン装置(10)の合計の電力使用量が規定値以下となるように、複数のクレーン装置の動作を制御する統括制御部(40)を備える。また、統括制御部(40)は、荷役施設に備わる複数のクレーン装置(10)の合計の電力使用量の予測値を計算し、予測値に基づいて複数のクレーン装置(10)の動作を制御してもよい。【選択図】図1 |
---|