ELEVATOR GROUP MANAGEMENT CONTROL SYSTEM AND ELEVATOR CONTROL METHOD
To perform efficient allocation of a cage of an elevator.SOLUTION: According to this elevator group management control system, a first operation control part judges that there is a leftover when a crowded judgement part judges that a first cage is crowded and a passenger detection part detects that...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To perform efficient allocation of a cage of an elevator.SOLUTION: According to this elevator group management control system, a first operation control part judges that there is a leftover when a crowded judgement part judges that a first cage is crowded and a passenger detection part detects that a passenger at a landing place. the elevator group management control system comprises an allocation operation part which decides allocation of a second cage to a passenger without waiting for travel start of the first cage in the case that the second cage is on standby at a stop floor when it is judged by the first operation control part that there is a leftover.SELECTED DRAWING: Figure 1
【課題】エレベータのカゴの効率的な配車を行うこと。【解決手段】実施形態のエレベータ群管理制御システムは、第1の運行制御部は、満員判定部が第1のカゴが満員であると判定し、かつ、乗客検出部が乗り場に乗客を検出した場合に、積み残し有りの判定をし、エレベータ群管理制御装置は、第1の運行制御部によって積み残し有りと判定された場合に、第2のカゴが停止階に待機している場合には、第1のカゴの走行開始を待たずに、乗客への第2のカゴの配車を決定する配車演算部、を備える。【選択図】図1 |
---|