CONCRETE SURFACE REPAIR METHOD

To provide a method capable of making it difficult to generate a situation where curing of a repair material is not sufficient even in an injection method using an adhesive tape when a concrete surface is repaired.SOLUTION: A tape sticking process includes: a first step for sticking a first adhesive...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: KATSUNO AKIHIRO, INAGAKI TOMOYUKI, SHIMAUCHI HIDEKI, ICHIMURA SHUJI
Format: Patent
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:To provide a method capable of making it difficult to generate a situation where curing of a repair material is not sufficient even in an injection method using an adhesive tape when a concrete surface is repaired.SOLUTION: A tape sticking process includes: a first step for sticking a first adhesive tape to a concrete surface so as to cover a part to be repaired with the first adhesive tape by using a second adhesive tape and the first adhesive tape having an adhesive layer where the amount of a radical scavenger is smaller than that of the second adhesive tape; and a second step for sticking the second adhesive tape so as to cover the first adhesive tape and abut against the concrete surface.SELECTED DRAWING: Figure 5 【課題】コンクリート面の補修を行う際に、粘着テープを用いた注入工法においても、補修材の硬化が十分に硬化しない状況を発生し難くする方法を提供する。【解決手段】テープ貼付工程として、第2粘着テープと、第2粘着テープの粘着剤層よりもラジカル捕捉剤が少ない粘着剤層を有する第1粘着テープを使用し、補修対象部位が第1粘着テープで被覆されるように第1粘着テープをコンクリート面に貼付する第1工程と、第1粘着テープが被覆されるように、且つ、コンクリート面に当接するように、第2粘着テープを貼付する第2工程と、を設ける。【選択図】図5