WIRING METHOD OF PC STEEL MATERIAL
To wire PC steel material suitably even in a narrow installation place when a prestressed concrete structure is constructed by a post tension method.SOLUTION: The wiring method of the PC steel material using a wire device 100 comprises: a bending step of, in a state where a PC steel material 200 is...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng ; jpn |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | To wire PC steel material suitably even in a narrow installation place when a prestressed concrete structure is constructed by a post tension method.SOLUTION: The wiring method of the PC steel material using a wire device 100 comprises: a bending step of, in a state where a PC steel material 200 is placed along substantially the half circumference of the outer diameter of a main sheave 110 having the curvature corresponding to the PC steel material 200, bending the PC steel material 200 so as to correspond to the shape of the outer diameter of the main sheave 110 so as to bend the PC steel material 200 in the direction of the arrow Y by advancing the PC steel material 200 in the direction of the arrow X in the long longitudinal direction; and an insertion step of inserting the PC steel material 200 in a state separated from the main sheave 110 from the state along the main sheave 110 into a hollow sheath 310 embedded in a concrete structure 300 by advancing the PC steel material 200 in the longitudinal direction.SELECTED DRAWING: Figure 1
【課題】プレストレストコンクリート構造物をポストテンション方式により施工する際に狭い施工場所においてもPC鋼材を好適に配線する。【解決手段】配線装置100を用いたPC鋼材の配線方法は、PC鋼材200に応じた曲率を備えたメインシーブ110の外径の略半周にPC鋼材200を沿わせた状態で、長尺の長手方向にPC鋼材200を矢示X方向へ進行させることにより、メインシーブ110の外径の形状に対応するようにPC鋼材200を曲げてPC鋼材200が矢示Y方向になるように曲げる曲げステップと、長手方向にPC鋼材200を進行させることにより、メインシーブ110に沿わされた状態からメインシーブ110から離隔した状態になったPC鋼材200を、コンクリート構造物300に埋設された中空のシース310へ挿入する挿入ステップとを含む。【選択図】図1 |
---|